温馨提示:本站仅提供公开网络链接索引服务,不存储、不篡改任何第三方内容,所有内容版权归原作者所有
AI智能索引来源:http://www.srm.com/projects/new-london-embassy
点击访问原文链接

New London Embassy - Sir Robert McAlpine

New London Embassy - Sir Robert McAlpine Skip navigation Aa enter search term Close Accessibility Tool Office Locations X (formerly Twitter) Instagram Facebook LinkedIn YouTube Search site: Close Projects View All Projects View by sector close mega menu

Infrastructure

Read more

Commercial

Read more

Healthcare

Read more

Industrial

Read more

Heritage & Special Projects

Read more Who We Are About Us close mega menu

About us

It’s the quality of our people that makes us different.

Read more

Our Approach

We pride ourselves on delivering excellence

Read more

Our Vision

To be renowned for our work with clients and communities as we construct a better world for future generations.

Read more

Our Heritage

We are building on strong foundations.

Read more

Technical Excellence

Read more People & Culture close mega menu

People & Culture

A family business, for us, it’s always personal

Read more

Our People

Read more

SRM Board

Read more

Inclusion

Read more

Clients and Trusted Relationships

Read more

Supply Chain Partners

Read more

Our partnership with Maggie's

Read more Our Commitments close mega menu

Our Commitments

Read more

Sustainability

Read more

Health, Safety & Wellbeing

Read more

Quality

Read more

Compliance

Read more

Our Journey to Net Zero 2045

Read more Our Offices What We Do Expertise & Services close mega menu

Pre-Construction

Read more

Construction

Read more

Construction Management

Read more

Civil Engineering

Read more

Digital Construction

Read more

Geospatial Engineering

Read more

Façades

Read more

Lifting Solutions

Read more

Special Projects

Read more

Customer Care

Read more Specialist Businesses close mega menu

Capital Ventures

Read more

McAlpine Design Group

Read more

Axis Land Partnerships

Read more Sectors close mega menu

Infrastructure

Read more

Industrial

Read more

Commercial

Read more

Healthcare

Read more

Heritage & Special Projects

Read more

Defence

Read more Frameworks and Integrated Partnerships Careers Careers - Home Working for Us close mega menu

What's on offer?

Read more

Why join us?

Read more

Experienced Hires

Read more Emerging Talent close mega menu

Emerging Talent

Read more

Apprenticeships

Read more

Graduates

Read more

Placements & Student Sponsorship

Read more Meet the Team Search & Apply What's on Latest news Events Capital Ventures Display Search Constructing the New London Embassy

In conjunction with our partner BL Harbert International (BLHI) we delivered the US Government's New London Embassy in Wandsworth.

Sir Robert McAlpine Projects New London Embassy Building the New London Embassy required international collaboration to ensure it was designed and constructed to both US and UK standards. Situated on five acres in the Nine Elms area of Wandsworth, the US Government's New London Embassy includes a Chancery Office Building, Marine Security Guard Quarters, access control pavilions, a central utility plant, underground parking, and associated site work, utilities and infrastructure.

The new building – which we delivered in conjunction with our partner BL Harbert International (BLHI) – totals approximately 36,000 square metres in area. It was designed and constructed to US standards, however the following UK standards were also incorporated: BREEAM Outstanding compliance, the Mayor of London's energy hierarchy requirements, the London Borough of Wandsworth local planning requirements, and carbon neutrality.

The facility includes mission critical infrastructure such as back-up power generation systems, and secure office spaces.

The embassy building itself is a transparent, crystalline cubic form atop a colonnade. This represents the optimum ratio of maximum volume within minimum perimeter with resulting cost and energy management benefits. The top of the building is sheathed with a crystalline photovoltaic array on the entire roof, screening mechanical equipment from view. The total array of crystalline and thin-film photovoltaic on the building measures 8,300 square metres with a significant output of over 345,000 kWh of energy.

We developed the surrounding area into an urban park that connects the Thames embankment to the new pedestrian way to the south.

Project summary Client: US Department of State Sector: Commercial Value: Confidential Size: 48,128 square metre Region: London Services: McAlpine Design Group, Pre-Construction Completion Date: 2018 Working in partnership to develop innovative solutions Working in collaboration with our American partner, BL Harbert International (BLHI), we provided early contractor input during the design development phase of this exceptionally intricate building. We coordinated with the US State Department and the project architect, Kieran Timberlake, working as one team to ensure the design could be properly constructed within budget. During this phase, we were able to develop innovative solutions in the project supply chain, personnel recruitment and health and safety planning.

Delivering award-winning sustainability The Embassy building is a multiple award-winning flagship scheme for sustainability. It is BREEAM Outstanding, LEED Platinum and was awarded Gold by the CCS – the first five star seal: "The overall achievements are wide ranging, greatly appreciated by all and simply the 'go to' standards required to be a beacon to the industry, improving its image for all to see and try to replicate… Great stuff!"

Our leading innovations in this field include:

Combined Heat and Power systems – An efficient way to produce energy and heat for a building, sized to feed into a communal scheme to also power surrounding buildings. Thermal piling – Geothermal piles use the ground’s temperature to naturally heat water. Solar shading – ETFE solar sails around the façade to act as shading in the summer and help by acting as a second façade in the winter. Wastewater treatment – A large water treatment facility is being used to treat wastewater which is re-used in the large pond. Biodiverse gardens – Biodiverse gardens are incorporated into the building to address the challenge of increasing biodiversity on a tight London site. Regional materials – Much of the frame of the building has been sourced and manufactured locally helping to promote investment in the local economy. Reducing work on site The Embassy project was unique in our procurement process: all the equipment for the MEP had to be brought in from the USA. The ductwork and mechanical pipeline were prefabricated off site; the plant, wire, chillers, pumps and air-handling units all had to be transported from the States and maintained under fully controlled conditions both before and during installation. At every stage of the project we were able to reassure the client that the site was completely secure.

The nature of this procurement route means that there tends to be a surplus of good quality packaging material such as timber. We entered into a partnership with Goldfinger Factory, a social enterprise, that takes waste products to create new, high quality pieces of furniture.

Getting it right the first time Our work at the Embassy was completely bespoke – with everything tailored to the end user. From the unique envelope of the building, with its complex ballistic rating, to the intricacies of access control, everything is constructed to precise specifications.

The construction sequence of most buildings is determined by efficiency, programme and logistics, but on this project we had to 'build our way out': once an area had been completed we couldn't gain access a second time, so there was absolutely no margin for error. The building had to comply with US, BS and EN standards and so we ensured full compliance for us and our client.

Balancing community and client needs With such a sensitive site to construct, for a high profile diplomatic client, we were only too aware of the importance of reputational management. We ensured that the new Embassy was constructed with every possible security and confidentiality procedure strictly adhered to.

We were highly protective of our client's reputation in the local area, ensuring construction causes minimum disruption to the surroundings. We were heavily involved in schemes to improve local facilities – such as renovating the Rose Community Centre as part of our 9/11 Day of Service activities.

View Image View Image View Image View Image View Image View Image View Image Awards ENR Global Projects Award Winner Commercial projects Three Chamberlain Square The Three Chamberlain Square development in Birmingham sets a new benchmark for sustainable, city centre workspace

Sectors: Commercial Region: Midlands Read more about Shaping the future of workspace at Broadgate We delivered 1 Broadgate — a sustainable, high-performance commercial building redefining workspace in the heart of central London.

Sectors: Commercial Region: London Read more about Delivering a sustainable City landmark Early engagement, collaboration and our commitment to sustainable engineering excellence have underpinned our approach at 2 Finsbury Avenue.

Sectors: Commercial Region: London Read more about View all projects Tags New London Embassy London Construction Pre Construction McAlpine Design Group Contact Us Registered Office Concept House, Home Park Mill Link
Kings Langley
Hertfordshire
WD4 8UD
GB

Working For Us Careers Why Join Us What's On Offer Emerging Talent Experienced Hires About Us About Us Our Heritage People & Culture Our Commitments Compliance X (formerly Twitter) Instagram Facebook LinkedIn YouTube Terms of Use Privacy Notice & Cookie Policy Accessibility Top

智能索引记录